Cross-section calculation for three-phase and alternating current lines
Enter the required power or current, configure the cable length and maximum voltage drop and the app calculates the minimum required cable cross-section.
This app is a tool for calculating minimum cable cross-sections for three-phase and alternating current. No responsibility is assumed for incorrect use or calculation errors and resulting damage!
June 2, 2025
June 1, 2025
June 1, 2025
May 31, 2025
May 31, 2025
May 31, 2025
May 31, 2025
May 31, 2025
May 31, 2025
May 31, 2025